In ECC envirnoment, Is it possible to Audit a Production order.
Serialized material is Good's Issued to a production order during Assembly processes, however we have an audit team that have to verify that material is physically shipped V's Good's issued to Production order. Is this Possible?
We use ZPP_POD t-code as a systematic verification, but we want to verify physical v's systematic as material may be moved during assembly operation.
This Audit is also a Sarbanes Oxley requirement.
Is there SAP functionality to support this. Thanks